This guide explains daily start-up, operation and shutdown of the EVX CS-2M 2 MWh container energy storage system.
Before start-up
- Confirm the fire suppression system is normal.
- Check coolant level and pressure.
- Verify EMS and PCS communication.
Start-up
- Close the auxiliary power switch.
- Start the BMS and wait for self-test.
- Start the PCS and enter standby.
- Select the operating strategy in the EMS.
Daily operation
Check system efficiency, cell temperature and SOC every hour. Stop the system immediately on a level-1 alarm and contact service.
Shutdown
- Stop charging/discharging in the EMS.
- Switch the PCS to stopped state.
- Open the auxiliary power switch.
Notes
- Never plug or unplug HV connectors under load.
- No flammable materials inside the container.
- Apply lockout/tagout before maintenance.